On September 30 of this year, at the session chaired by President Mesrop Mesropyan in the Public Services Regulatory Commission, a decision was adopted, which defined the power level of electricity in the power system. New requirement for publication of the factor of truth. This is reported by the PSC. According to the decision, by December 1, 2026, "Electric Power System Operator" CJSC is obliged to publish information on the permissible range of the specified capacity factor on its official website. regarding the products. The relevant information refers to the demarcation points of the power system at which the distributor and qualified consumers must ensure the proper operation of the power system under their management. By keeping the defined permissible ranges. The new regulation is intended to contribute to the reliable and efficient operation of the electric power system, as well as clarify the actual activity of the electric power system operator and the licensed in the electric power market. The relationships between the persons involved.
Economy
The PSC has established new requirements regarding the publication of the power factor in the power system

Source: KARTSIQ