According to the Road Department of the Ministry of Road Transport of Georgia, construction of a retaining wall is underway on the 77th km section of the international (M-3) Mtskheti-Stepantsminda-Larsi (to the border of the Russian Federation) highway (village of Arakhveti), as a result of which, until December 11 inclusive, the movement of motor vehicles along the specified section will be carried out with partial restrictions, using one lane (contact person: Koba Geladze, 599 68 22 22). Corresponding signs will be installed on the specified section of the road. This is reported by the Embassy of the Republic of Armenia in Georgia.
“The traffic will be carried out under the direct supervision and coordination of the patrol police,” the statement says.

